Kitchen and Flooring Upgrades
Downtown Atascadero, Ca
Project start date: Mid October 2026
Projected project finish date: December 2026
Fire mantel stuccoed over old brick and mounted tv over fireplace, cabinets removed and replaced, new sink installed with updated plumbing, new flooring throughout, new baseboard, paint touched up where needed, new vanities in both bathrooms.
Before/after of Project
-
Cabinets/flooring before
-
Second view of kitchen cabinets/flooring before
-
After cabinets pulled out and flooring pulled out
-
There was water rot so drywall pulled
-
Drywall put up but not finished
-
Full view of kitchen empty before new cabinets and flooring
-
Drywall re installed due to water damage mudded and prepped before paint
-
New cabinets from the view of the front entry
-
Full view of kitchen with new cabinets and new appliances
-
Living room before new flooring and baseboard installed
-
Downstairs bathroom before new flooring, baseboard, and vanity.
-
Stairway before new flooring
-
Different view of living room before upgraded flooring and baseboard
-
View of kitchen with floors compete, as well as microwave/fan installed
-
Another view of kitchen with cabinets, appliances, and flooring complete. (fridge is pulled out to paint the wall behind it.
-
Another view of kitchen
-
Dining area with new flooring and baseboard leading into living room
-
Bathroom downstairs after flooring installed
-
Living room after flooring and baseboard complete
-
Another view of living room showing completed flooring and baseboard up to staircase. upstairs and stairs are being completed in phase 2 of project
-
Another view of living room after flooring, baseboard, and fireplace stucco complete
-
Front view of re finished fireplace
-
Fireplace was brick, so stuccoed over, hung shelf and tv. Painted wall and added new trim to slider
-